Question 23

Our team responds to the requirements as follows:
1) We have completed the design and the construction of a building corresponding to letter 4.2 a);
2) In our portfolio, we do not have a building in category 4.2 b), even though we have designed and built other buildings with less than 5000 square meters;
3) we have completed several studies or competition proposals (category 4.2 c)).
In which category are we? Matador architects or emerging architects? How do we fill the different pages of the projects listed in section 6.1.1.?

In this case, list yourself as matador architects. In the project requirement 4.2 b), provide a project that corresponds to 4.2 c). The jury will be notified of this situation and will be left with the final decision, to which category you belong.